Daily Guardian UAEDaily Guardian UAE
  • Home
  • UAE
  • What’s On
  • Business
  • World
  • Entertainment
  • Lifestyle
  • Sports
  • Technology
  • Travel
  • Web Stories
  • More
    • Editor’s Picks
    • Press Release
What's On

GPCA and IRU join forces to drive safety in dangerous goods transport

April 29, 2026

Motorola’s next budget phone leaks in two Pantone colors with a 200MP camera in tow

April 29, 2026

Mashreq Partners with Cashew for Seamless Financing Solutions

April 29, 2026

PlayStation wants to see your papers before you party chat

April 29, 2026

Ajman Bank Reports AED 134M Profit in Q1 2026

April 29, 2026
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian UAE
Subscribe
  • Home
  • UAE
  • What’s On
  • Business
  • World
  • Entertainment
  • Lifestyle
  • Sports
  • Technology
  • Travel
  • Web Stories
  • More
    • Editor’s Picks
    • Press Release
Daily Guardian UAEDaily Guardian UAE
Home » Odysseus lander mission expected to end early due to power issue
Technology

Odysseus lander mission expected to end early due to power issue

By dailyguardian.aeFebruary 27, 20242 Mins Read
Share
Facebook Twitter LinkedIn Pinterest Email

NASA and Intuitive Machines may have made history recently with the first U.S. lunar landing in more than 50 years, but it looks like the mission will come to an end much sooner than hoped. As the Odysseus lander came in for its descent last week, it caught on the surface and tipped over onto its side. Now, Intuitive Machines has announced that it expects the lander to stop communications on the morning of Tuesday, February 27 — cutting the mission shorter than the week or more on the surface that was originally hoped for.

Intuitive Machines also released a low-resolution image taken after the spacecraft pitched over, showing its view of the moon’s surface:

“After understanding the end-to-end communication requirements, Odysseus sent images from the lunar surface of its vertical descent to its Malapert A landing site, representing the furthest south any vehicle has been able to land on the moon and establish communication with ground controllers,” the company wrote in an update.

The problem seems to be that the solar panels of the lander will soon stop collecting sunlight, so the lander will run out of power. “Based on Earth and moon positioning, we believe flight controllers will continue to communicate with Odysseus until Tuesday morning,” the company wrote.

In addition to this update, NASA also shared an image of the lander on the moon’s surface captured by the Lunar Reconnaissance Orbiter (LRO) spacecraft. It shows the dot of the lander as seen from orbit at an altitude of around 56 miles above the surface:

This shows that the lander is in a relatively steep crater of 12 degrees, which could have contributed to challenges with the landing.

It remains to be seen how much data the Odysseus lander will be able to collect and send to Earth given its limited supply of power. It’s also not fully known to what extent the tipping of the lander has impacted the payloads on board, although in an update last week, Intuitive Machines did say that at least some of the instruments were operational and collecting data.

Editors’ Recommendations











Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

Motorola’s next budget phone leaks in two Pantone colors with a 200MP camera in tow

PlayStation wants to see your papers before you party chat

Uber now lets you book hotel rooms and have your driver bring you snacks

Claude just got a scam detector, and it could save you from a costly mistake

Snapchat’s new ad format makes AI chatbots sound like salespeople

Pixel 11’s Tensor G6 could be fast, just not for gaming

Your GM car just got a lot smarter with Google Gemini upgrade

Perplexity Comet Browser finally learns how to multitask on iPad

DJI Mic Mini 2 lets you color-match your mic to your outfit

Editors Picks

Motorola’s next budget phone leaks in two Pantone colors with a 200MP camera in tow

April 29, 2026

Mashreq Partners with Cashew for Seamless Financing Solutions

April 29, 2026

PlayStation wants to see your papers before you party chat

April 29, 2026

Ajman Bank Reports AED 134M Profit in Q1 2026

April 29, 2026

Subscribe to News

Get the latest UAE news and updates directly to your inbox.

Latest Posts

Uber now lets you book hotel rooms and have your driver bring you snacks

April 29, 2026

Enhancing Efficiency at Bahna Power Plant

April 29, 2026

Claude just got a scam detector, and it could save you from a costly mistake

April 29, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Daily Guardian UAE. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.