Daily Guardian UAEDaily Guardian UAE
  • Home
  • UAE
  • What’s On
  • Business
  • World
  • Entertainment
  • Lifestyle
  • Sports
  • Technology
  • Travel
  • Web Stories
  • More
    • Editor’s Picks
    • Press Release
What's On

Sultan bin Ahmed visits charitable initiatives in Bali

September 19, 2026

Core42, TII Partner to Advance UAE Digital Sovereignty, Security

September 19, 2026

UBF CEOs Advisory Council Holds Quarterly Meeting

September 19, 2026

Sharjah Booksellers Conference Unites 912 Publishers from 99 Nations

September 19, 2026

Cosmo Developments launches AED 6 billion “THE WADI” project in Abu Dhabi

September 18, 2026
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian UAE
Subscribe
  • Home
  • UAE
  • What’s On
  • Business
  • World
  • Entertainment
  • Lifestyle
  • Sports
  • Technology
  • Travel
  • Web Stories
  • More
    • Editor’s Picks
    • Press Release
Daily Guardian UAEDaily Guardian UAE
Home » Key moment approaches for NASA’s crewed moon mission
Technology

Key moment approaches for NASA’s crewed moon mission

By dailyguardian.aeJanuary 23, 20262 Mins Read
Share
Facebook Twitter LinkedIn Pinterest Email

After moving the massive SLS rocket and Orion spacecraft to the launchpad last weekend, NASA is now eyeing the next stage of its preparations for Artemis II, the first crewed lunar mission in more than five decades.

Now firmly in place at Launch Pad 39B at the Kennedy Space Center in Florida, the rocket will be put through a so-called “wet dress rehearsal” this weekend.

A wet dress rehearsal is the final full-scale test before a rocket launch, where the vehicle is loaded with cryogenic propellants such as liquid oxygen and hydrogen, and the countdown proceeds to just a few seconds before ignition.

The important procedure simulates real launch conditions to verify that all systems, ground equipment, and team procedures are functioning correctly under operational stress.

Any issues that surface can then be quickly addressed ahead of the launch, ensuring the mission’s safety and success.

“Technicians hooked up purge lines meant to keep cavities of the rocket and spacecraft in the right conditions, enabled communications with the Launch Control Center, and performed swing tests of the crew access arm — the bridge that allows the crew and other personnel to access Orion,” NASA said in a post on its website.

“The emergency egress system, a slide-wire and basket systems that allows for a quick exit in the case of an emergency, also was connected, allowing teams to practice releasing the baskets. Orion and elements of the rocket, including the core stage, interim cryogenic propulsion stage, and boosters, have been powered on.”

The team is now preparing to load around 700,000 gallons of cryogenic propellants into the rocket. Following the countdown, the propellants will be removed from the SLS rocket.

NASA said that if any serious anomalies are found during the wet dress rehearsal, engineers can transport the SLS and Orion back to the nearby Vehicle Assembly Building for additional work.

Three NASA astronauts and one from the Canadian Space Agency will embark on a 10-day mission around the moon — with no touchdown on the lunar surface — in a flight that will pave the way for a future lunar landing, possibly before the end of this decade.

The launch window opens on February 6.

“The mission management team will assess flight readiness after the wet dress rehearsal across the spacecraft, launch infrastructure, and the crew and operations teams before selecting a launch date,” NASA said.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

Lenovo AeroBlade imagines a laptop as thin as a foldable phone, thanks to solid-state cooling

Lenovo puts Nvidia RTX Spark into its new Yoga Pro laptops for local AI at IFA 2026

Motorola’s new Edge 70 Plus packs a 200MP camera and a massive battery

We got GTA VI limited-edition DualSense controllers before GTA VI

Anker unveils smarter chargers and power banks built to fight heat and battery degradation

Anker’s new Soundcore Sleep earbuds can mask snoring and even track your heart rate

TCL P80 series finally marries eye-friendly NXTPAPER tech with an AMOLED panel

Anker’s new MindBase wants to be the brain of your entire home security system

I found 5 cleaning deals worth sweeping up this Labor Day

Editors Picks

Core42, TII Partner to Advance UAE Digital Sovereignty, Security

September 19, 2026

UBF CEOs Advisory Council Holds Quarterly Meeting

September 19, 2026

Sharjah Booksellers Conference Unites 912 Publishers from 99 Nations

September 19, 2026

Cosmo Developments launches AED 6 billion “THE WADI” project in Abu Dhabi

September 18, 2026

Subscribe to News

Get the latest UAE news and updates directly to your inbox.

Latest Posts

PureHealth launches AI-powered solution to enhance access to healthcare services for Daman members

September 18, 2026

Panspectrum Training Solutions announces official Dubai launch

September 18, 2026

Help AG launches Quantum 360 at GISEC 2026 to advance post-quantum readiness in UAE

September 18, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Daily Guardian UAE. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.