Daily Guardian UAEDaily Guardian UAE
  • Home
  • UAE
  • What’s On
  • Business
  • World
  • Entertainment
  • Lifestyle
  • Sports
  • Technology
  • Travel
  • Web Stories
  • More
    • Editor’s Picks
    • Press Release
What's On

More Than a Verdict: How Russell Nicolet Is Building a Tech-Enabled Personal Injury Firm 

March 19, 2026

Alienware 16X Aurora review: I tested Dell’s gaming middle-weight, but it’s a heavy-hitter 

March 19, 2026

Microsoft will no longer auto-install M365 Copilot app on Windows PCs

March 19, 2026

You can now try Perplexity’s Comet browser on your iPhone

March 18, 2026

The Sennheiser HD 660S2 is 38% off, and it’s the audiophile headphone upgrade I’d recommend without hesitation

March 18, 2026
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian UAE
Subscribe
  • Home
  • UAE
  • What’s On
  • Business
  • World
  • Entertainment
  • Lifestyle
  • Sports
  • Technology
  • Travel
  • Web Stories
  • More
    • Editor’s Picks
    • Press Release
Daily Guardian UAEDaily Guardian UAE
Home » Key moment approaches for NASA’s crewed moon mission
Technology

Key moment approaches for NASA’s crewed moon mission

By dailyguardian.aeJanuary 23, 20262 Mins Read
Share
Facebook Twitter LinkedIn Pinterest Email

After moving the massive SLS rocket and Orion spacecraft to the launchpad last weekend, NASA is now eyeing the next stage of its preparations for Artemis II, the first crewed lunar mission in more than five decades.

Now firmly in place at Launch Pad 39B at the Kennedy Space Center in Florida, the rocket will be put through a so-called “wet dress rehearsal” this weekend.

A wet dress rehearsal is the final full-scale test before a rocket launch, where the vehicle is loaded with cryogenic propellants such as liquid oxygen and hydrogen, and the countdown proceeds to just a few seconds before ignition.

The important procedure simulates real launch conditions to verify that all systems, ground equipment, and team procedures are functioning correctly under operational stress.

Any issues that surface can then be quickly addressed ahead of the launch, ensuring the mission’s safety and success.

“Technicians hooked up purge lines meant to keep cavities of the rocket and spacecraft in the right conditions, enabled communications with the Launch Control Center, and performed swing tests of the crew access arm — the bridge that allows the crew and other personnel to access Orion,” NASA said in a post on its website.

“The emergency egress system, a slide-wire and basket systems that allows for a quick exit in the case of an emergency, also was connected, allowing teams to practice releasing the baskets. Orion and elements of the rocket, including the core stage, interim cryogenic propulsion stage, and boosters, have been powered on.”

The team is now preparing to load around 700,000 gallons of cryogenic propellants into the rocket. Following the countdown, the propellants will be removed from the SLS rocket.

NASA said that if any serious anomalies are found during the wet dress rehearsal, engineers can transport the SLS and Orion back to the nearby Vehicle Assembly Building for additional work.

Three NASA astronauts and one from the Canadian Space Agency will embark on a 10-day mission around the moon — with no touchdown on the lunar surface — in a flight that will pave the way for a future lunar landing, possibly before the end of this decade.

The launch window opens on February 6.

“The mission management team will assess flight readiness after the wet dress rehearsal across the spacecraft, launch infrastructure, and the crew and operations teams before selecting a launch date,” NASA said.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

More Than a Verdict: How Russell Nicolet Is Building a Tech-Enabled Personal Injury Firm 

Alienware 16X Aurora review: I tested Dell’s gaming middle-weight, but it’s a heavy-hitter 

Microsoft will no longer auto-install M365 Copilot app on Windows PCs

You can now try Perplexity’s Comet browser on your iPhone

The Sennheiser HD 660S2 is 38% off, and it’s the audiophile headphone upgrade I’d recommend without hesitation

Here’s all the amazing things we saw in the Spider-Man: Brand New Day trailer

YouTube is outsourcing its AI slop problem to you, and that’s a terrible idea

Spotify has a new Exclusive Mode to please audiophile ears with bit-perfect playback

Audi A2 e-tron is coming this Fall as the German label’s entry-level EV

Editors Picks

Alienware 16X Aurora review: I tested Dell’s gaming middle-weight, but it’s a heavy-hitter 

March 19, 2026

Microsoft will no longer auto-install M365 Copilot app on Windows PCs

March 19, 2026

You can now try Perplexity’s Comet browser on your iPhone

March 18, 2026

The Sennheiser HD 660S2 is 38% off, and it’s the audiophile headphone upgrade I’d recommend without hesitation

March 18, 2026

Subscribe to News

Get the latest UAE news and updates directly to your inbox.

Latest Posts

Here’s all the amazing things we saw in the Spider-Man: Brand New Day trailer

March 18, 2026

YouTube is outsourcing its AI slop problem to you, and that’s a terrible idea

March 18, 2026

Wio Bank PJSC reports AED 61 billion assets and record revenue of AED 1.24 billion in FY2025

March 18, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Daily Guardian UAE. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.