Daily Guardian UAEDaily Guardian UAE
  • Home
  • UAE
  • What’s On
  • Business
  • World
  • Entertainment
  • Lifestyle
  • Sports
  • Technology
  • Travel
  • Web Stories
  • More
    • Editor’s Picks
    • Press Release
What's On

Shurooq announces expansion of Al Faya Retreat to 20 accommodation units under sustainable cultural tourism vision

September 18, 2026

DP World ILT20 Development Tournament – Kuwait begins today

September 17, 2026

UAE’s First Organic Waste-to-Biogas Pilot Plant Launches in Al Ain

September 17, 2026

Paramount and SecurityBridge partner to secure SAP systems

September 17, 2026

الخبير الاقتصادي أحمد عنيزان يشارك في قمة الإعلام العربي 2026 ويناقش تأثير منصات التواصل على قرارات شراء الذهب

September 17, 2026
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian UAE
Subscribe
  • Home
  • UAE
  • What’s On
  • Business
  • World
  • Entertainment
  • Lifestyle
  • Sports
  • Technology
  • Travel
  • Web Stories
  • More
    • Editor’s Picks
    • Press Release
Daily Guardian UAEDaily Guardian UAE
Home » NASA confirms target date for crewed Artemis II lunar flight
Technology

NASA confirms target date for crewed Artemis II lunar flight

By dailyguardian.aeFebruary 17, 20262 Mins Read
Share
Facebook Twitter LinkedIn Pinterest Email

NASA has announced a date for the second wet dress rehearsal for the SLS rocket that will send a crew of astronauts on a voyage around the moon in the highly anticipated Artemis II mission.

The space agency also confirmed that the earliest the rocket could launch is Friday, March 6.

NASA is now targeting Thursday, February 19, for the fueling part of the wet dress rehearsal at the Kennedy Space Center launch site in Florida.

The rehearsal is a key part of flight preparation and involves engineers fueling the rocket and going through the entire launch procedure short of actually igniting the engines.

During the first Artemis II rehearsal at the start of this month, engineers spotted a hydrogen leak at the base of the SLS rocket, prompting the team to ditch the target launch date of February 8 while it addressed the issue.

NASA said that it will only announce a new target launch date once the results of the second wet dress rehearsal have been fully assessed, but said the rocket would not lift off before March 6.

“The wet dress rehearsal will run the launch team as well as supporting teams through a full range of operations, including loading cryogenic liquid propellant into the SLS rocket’s tanks, conducting a launch countdown, demonstrating the ability to recycle the countdown clock, and draining the tanks to practice scrub procedures,” NASA said in a post on its website on Monday.

It added that the launch controllers will arrive at their consoles in the Launch Control Center at Kennedy at 6:40 p.m. ET on Tuesday to start the nearly 50-hour countdown. The simulated launch time is 8:30 p.m. on Thursday.

The Artemis II mission will send NASA astronauts Victor Glover, Reid Wiseman, and Christina Koch, together with the Canadian Space Agency’s Jeremy Hansen, on a 10-day flight around the moon aboard the Orion spacecraft. It’ll be the first crewed lunar-bound flight since the final Apollo mission in 1972.

The mission will test the spacecraft’s systems and deep-space operations to validate them for future crewed moon missions and lunar landings.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

Lenovo AeroBlade imagines a laptop as thin as a foldable phone, thanks to solid-state cooling

Lenovo puts Nvidia RTX Spark into its new Yoga Pro laptops for local AI at IFA 2026

Motorola’s new Edge 70 Plus packs a 200MP camera and a massive battery

We got GTA VI limited-edition DualSense controllers before GTA VI

Anker unveils smarter chargers and power banks built to fight heat and battery degradation

Anker’s new Soundcore Sleep earbuds can mask snoring and even track your heart rate

TCL P80 series finally marries eye-friendly NXTPAPER tech with an AMOLED panel

Anker’s new MindBase wants to be the brain of your entire home security system

I found 5 cleaning deals worth sweeping up this Labor Day

Editors Picks

DP World ILT20 Development Tournament – Kuwait begins today

September 17, 2026

UAE’s First Organic Waste-to-Biogas Pilot Plant Launches in Al Ain

September 17, 2026

Paramount and SecurityBridge partner to secure SAP systems

September 17, 2026

الخبير الاقتصادي أحمد عنيزان يشارك في قمة الإعلام العربي 2026 ويناقش تأثير منصات التواصل على قرارات شراء الذهب

September 17, 2026

Subscribe to News

Get the latest UAE news and updates directly to your inbox.

Latest Posts

Alshaya Group Opens Its First Company-Owned Distribution Centre in Kuwait

September 17, 2026

GEMS Education and Napster Partner to Advance Human-Centered AI Agents and Digital Personas in Education

September 17, 2026

Sharp rise in outsourcing by UAE hotels says FM expert

September 17, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Daily Guardian UAE. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.