Daily Guardian UAEDaily Guardian UAE
  • Home
  • UAE
  • What’s On
  • Business
  • World
  • Entertainment
  • Lifestyle
  • Sports
  • Technology
  • Travel
  • Web Stories
  • More
    • Editor’s Picks
    • Press Release
What's On

I went hands-on with Samsung Galaxy Z Fold 8 Ultra. It’s peak foldable in an old garb. 

July 23, 2026

Samsung makes it easier to run multiple apps on Galaxy Z Flip 8’s cover screen

July 23, 2026

The LG C6 OLED is great out of the box. These settings make it even better.

July 23, 2026

A MacBook Neo refresh may already be in testing and could address its biggest performance bottlenecks

July 23, 2026

What Features Should You Look for in an AI-Powered Laptop or Copilot+ PC?

July 23, 2026
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian UAE
Subscribe
  • Home
  • UAE
  • What’s On
  • Business
  • World
  • Entertainment
  • Lifestyle
  • Sports
  • Technology
  • Travel
  • Web Stories
  • More
    • Editor’s Picks
    • Press Release
Daily Guardian UAEDaily Guardian UAE
Home » NASA’s mega moon rocket has arrived at the launchpad. What’s next?
Technology

NASA’s mega moon rocket has arrived at the launchpad. What’s next?

By dailyguardian.aeJanuary 19, 20262 Mins Read
Share
Facebook Twitter LinkedIn Pinterest Email

NASA’s Space Launch System (SLS) rocket and Orion spacecraft reached the Launch Pad 39B at the Kennedy Space Center in Florida on Saturday following a 4-mile, 12-hour crawl from the Vehicle Assembly Building.

The rocket is being prepped for the Artemis II mission, which will carry three Americans and one Canadian on a voyage around the moon, taking humans further from Earth than ever before.

NASA astronauts Christina Koch, Victor Glover, and Reid Wiseman, along with CSA astronaut Jeremy Hansen, have been in training for the much-anticipated mission ever since when they were announced as part of the crew in 2023.

The space agency is currently targeting no earlier than February 6 for the launch of the 10-day flight, though it could lift off as late as April depending on how the final preparations proceed.

NASA’s team of engineers and technicians will now set about preparing the Artemis II rocket for the wet dress rehearsal, a key procedure that tests fueling operations and countdown procedures.

“Targeted for no later than February 2, the team will load the rocket with cryogenic, or super-cold, propellants, run through the countdown, and practice safely draining the propellants from the rocket,” NASA said in a release.

It added that additional wet dress rehearsals may be needed to make sure that the rocket is ready for flight.

Depending on how the final preparations proceed, NASA could even return the SLS and Orion to the Vehicle Assembly Building for additional work prior to launch.

Artemis II will pave the way for the Artemis III mission, an even bolder endeavor that will return humans to the lunar surface after an absence of more than five decades. That mission is currently set for no earlier than 2027.

The first Artemis mission took place in 2022 and involved the maiden flight of the SLS rocket, which sent an empty Orion spacecraft on a voyage around the moon.

Beyond Artemis III, NASA is planning to build a permanent base on the lunar surface where astronauts will be able to live and work, similar to how they currently operate on the International Space Station. The moon base will also serve as a stepping stone for the first crewed mission to Mars.

Commenting on the Artemis II mission just recently, crew member Reid Wiseman said, “We definitely feel the pressure.”

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

I went hands-on with Samsung Galaxy Z Fold 8 Ultra. It’s peak foldable in an old garb. 

Samsung makes it easier to run multiple apps on Galaxy Z Flip 8’s cover screen

The LG C6 OLED is great out of the box. These settings make it even better.

A MacBook Neo refresh may already be in testing and could address its biggest performance bottlenecks

What Features Should You Look for in an AI-Powered Laptop or Copilot+ PC?

The MacBook Air and iMac are next in line for Apple’s OLED push

Fold 8 Ultra vs. Fold 7: Upgrades across the board, but is the Ultra really worth the upgrade?

I tried the Samsung Galaxy Z Fold 8 and I am totally in love with this unique foldable

Samsung enters the AI glasses race with Gemini-powered Intelligent Eyewear

Editors Picks

Samsung makes it easier to run multiple apps on Galaxy Z Flip 8’s cover screen

July 23, 2026

The LG C6 OLED is great out of the box. These settings make it even better.

July 23, 2026

A MacBook Neo refresh may already be in testing and could address its biggest performance bottlenecks

July 23, 2026

What Features Should You Look for in an AI-Powered Laptop or Copilot+ PC?

July 23, 2026

Subscribe to News

Get the latest UAE news and updates directly to your inbox.

Latest Posts

The MacBook Air and iMac are next in line for Apple’s OLED push

July 23, 2026

Fold 8 Ultra vs. Fold 7: Upgrades across the board, but is the Ultra really worth the upgrade?

July 23, 2026

I tried the Samsung Galaxy Z Fold 8 and I am totally in love with this unique foldable

July 22, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Daily Guardian UAE. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.