Daily Guardian UAEDaily Guardian UAE
  • Home
  • UAE
  • What’s On
  • Business
  • World
  • Entertainment
  • Lifestyle
  • Sports
  • Technology
  • Travel
  • Web Stories
  • More
    • Editor’s Picks
    • Press Release
What's On

Elon Musk’s SpaceX could be making an AI device that’s slimmer than the iPhone

July 2, 2026

Cinder City wants 64GB of RAM, and the rest of its PC specs make it even weirder

July 2, 2026

The entry-level MacBook Pro could get a design refresh in 2027, and it’s about time

July 2, 2026

Apple’s M6 chip isn’t even here yet, but you’ll see M7 Macs early in 2027

July 2, 2026

A ‘meh’ iPad Pro refresh lands in 2027 with a cooling boost to handle your demanding workloads

July 2, 2026
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian UAE
Subscribe
  • Home
  • UAE
  • What’s On
  • Business
  • World
  • Entertainment
  • Lifestyle
  • Sports
  • Technology
  • Travel
  • Web Stories
  • More
    • Editor’s Picks
    • Press Release
Daily Guardian UAEDaily Guardian UAE
Home » NASA confirms burn-up date for failed Peregrine spacecraft
Technology

NASA confirms burn-up date for failed Peregrine spacecraft

By dailyguardian.aeJanuary 17, 20242 Mins Read
Share
Facebook Twitter LinkedIn Pinterest Email

Astrobotic’s Peregrine spacecraft will burn up in Earth’s atmosphere on Thursday, January 18, NASA has confirmed.

Pittsburgh-based Astrobotic said earlier in the week that the burn-up of the Peregrine spacecraft, which is about the size of a storage shed, posed no safety risks and will remove from orbit what would otherwise become a piece of hazardous space junk.

The mission was supposed to put the first U.S. lander on the moon since the final Apollo mission five decades ago, but a debilitating propellant leak that began shortly after launch on January 8 prevented the spacecraft from reaching the lunar surface.

However, the bid to also become the first private company to put a lander on the moon hasn’t been cast as a complete failure, as Astrobotic managed to keep the spacecraft operational for much longer than expected, partly because the propellant leakage eased.

This enabled the team to power up some of Peregrine’s 21 payloads and to run other checks on the vehicle, with the gathered data set to prove useful for future Astrobotic missions.

Peregrine Mission 1 was part of NASA’s new CLPS (Commercial Lunar Payload Services) program, which involves the space agency contracting commercial entities to send science missions to the moon ahead of the first Artemis crewed landing, which is expected to take place in 2026.

“I am so proud of what our team has accomplished with this mission,” Astrobotic CEO John Thornton said recently. “It is a great honor to witness firsthand the heroic efforts of our mission control team overcoming enormous challenges to recover and operate the spacecraft after Monday’s propulsion anomaly.”

Thornton added: “This mission has already taught us so much and has given me great confidence that our next mission to the moon will achieve a soft landing.”

That mission involves the Griffin Lander, which Astrobotic hopes to put on the lunar surface in November.

Editors’ Recommendations











Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

Elon Musk’s SpaceX could be making an AI device that’s slimmer than the iPhone

Cinder City wants 64GB of RAM, and the rest of its PC specs make it even weirder

The entry-level MacBook Pro could get a design refresh in 2027, and it’s about time

Apple’s M6 chip isn’t even here yet, but you’ll see M7 Macs early in 2027

A ‘meh’ iPad Pro refresh lands in 2027 with a cooling boost to handle your demanding workloads

Study finds humans will talk to AI ghosts of the dead as reincarnations, and it’s pretty grim

The iPhone 18 Pro could launch in these three colors, and black still isn’t one of them

SwitchBot’s new outdoor security camera uses AI to describe activity around your home

Sony kills physical PlayStation games. The era of discs comes to an end for Team Blue

Editors Picks

Cinder City wants 64GB of RAM, and the rest of its PC specs make it even weirder

July 2, 2026

The entry-level MacBook Pro could get a design refresh in 2027, and it’s about time

July 2, 2026

Apple’s M6 chip isn’t even here yet, but you’ll see M7 Macs early in 2027

July 2, 2026

A ‘meh’ iPad Pro refresh lands in 2027 with a cooling boost to handle your demanding workloads

July 2, 2026

Subscribe to News

Get the latest UAE news and updates directly to your inbox.

Latest Posts

Study finds humans will talk to AI ghosts of the dead as reincarnations, and it’s pretty grim

July 2, 2026

The iPhone 18 Pro could launch in these three colors, and black still isn’t one of them

July 2, 2026

Fujairah Tennis Club: Gateway to Etihad Rail Adventures

July 1, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Daily Guardian UAE. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.