Daily Guardian UAEDaily Guardian UAE
  • Home
  • UAE
  • What’s On
  • Business
  • World
  • Entertainment
  • Lifestyle
  • Sports
  • Technology
  • Travel
  • Web Stories
  • More
    • Editor’s Picks
    • Press Release
What's On

Cosmo Developments launches AED 6 billion “THE WADI” project in Abu Dhabi

September 18, 2026

PureHealth launches AI-powered solution to enhance access to healthcare services for Daman members

September 18, 2026

Panspectrum Training Solutions announces official Dubai launch

September 18, 2026

Help AG launches Quantum 360 at GISEC 2026 to advance post-quantum readiness in UAE

September 18, 2026

United Arab Bank Ranks 10th Globally in Its Peer Group in Forbes’ World’s Top Performing Banks 2026

September 18, 2026
Facebook X (Twitter) Instagram
Finance Pro
Facebook X (Twitter) Instagram
Daily Guardian UAE
Subscribe
  • Home
  • UAE
  • What’s On
  • Business
  • World
  • Entertainment
  • Lifestyle
  • Sports
  • Technology
  • Travel
  • Web Stories
  • More
    • Editor’s Picks
    • Press Release
Daily Guardian UAEDaily Guardian UAE
Home » While NASA’s lunar dreams wait, another crew eyes orbit
Technology

While NASA’s lunar dreams wait, another crew eyes orbit

By dailyguardian.aeFebruary 4, 20263 Mins Read
Share
Facebook Twitter LinkedIn Pinterest Email

NASA’s first crewed lunar mission in more than 50 years won’t be getting underway this month after all.

It had been targeting February 6 for the launch of the much-anticipated Artemis II mission that will take four astronauts on a flight around the moon, but after issues surfaced during a critical preflight test on Tuesday, NASA decided that it won’t launch the SLS rocket until March at the earliest.

During the so-called “wet dress rehearsal” in which engineers fuel the rocket and go through the entire launch procedure without actually igniting the engines, a hydrogen leak was detected at the base of the SLS rocket.

The upcoming launch window runs from February 6 through 11, but NASA has decided it needs more time to review the situation, with a second rehearsal also likely. That’s meant pushing the launch date to March 6 at the earliest.

“With more than three years between SLS launches, we fully anticipated encountering challenges,” NASA chief Jared Isaacman wrote in a post on X on Tuesday. “That is precisely why we conduct a wet dress rehearsal. These tests are designed to surface issues before flight and set up launch day with the highest probability of success.”

The schedule update means that the Artemis II astronauts — NASA’s Victor Glover, Reid Wiseman, and Christina Koch, together with the Canadian Space Agency’s Jeremy Hansen — will have a bit of extra time on terra firma before they blast to space.

It also means that another set of astronauts should be heading to orbit ahead of their lunar-bound colleagues. SpaceX’s Crew-12 — comprising NASA astronauts Jessica Meir and Jack Hathaway, along with the European Space Agency’s Sophie Adenot and Roscosmos cosmonaut Andrey Fedyaev — could be heading to the International Space Station as early as February 11.

At least, that had been the plan until Monday, when SpaceX said it was grounding its workhorse Falcon 9 rocket — the same vehicle type that will be carrying Crew-12 to orbit — after an issue occurred during a launch earlier that day when its upper stage failed to perform a deorbit burn as expected.

“Teams are reviewing data to determine root cause and corrective actions before returning to flight,” the company said in a post on X.

It’s unusual for the Falcon 9 to experience anomalies these days, so hopefully SpaceX can sort it out soon, paving the way for Crew-12’s ride to orbit next week as originally planned.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

Lenovo AeroBlade imagines a laptop as thin as a foldable phone, thanks to solid-state cooling

Lenovo puts Nvidia RTX Spark into its new Yoga Pro laptops for local AI at IFA 2026

Motorola’s new Edge 70 Plus packs a 200MP camera and a massive battery

We got GTA VI limited-edition DualSense controllers before GTA VI

Anker unveils smarter chargers and power banks built to fight heat and battery degradation

Anker’s new Soundcore Sleep earbuds can mask snoring and even track your heart rate

TCL P80 series finally marries eye-friendly NXTPAPER tech with an AMOLED panel

Anker’s new MindBase wants to be the brain of your entire home security system

I found 5 cleaning deals worth sweeping up this Labor Day

Editors Picks

PureHealth launches AI-powered solution to enhance access to healthcare services for Daman members

September 18, 2026

Panspectrum Training Solutions announces official Dubai launch

September 18, 2026

Help AG launches Quantum 360 at GISEC 2026 to advance post-quantum readiness in UAE

September 18, 2026

United Arab Bank Ranks 10th Globally in Its Peer Group in Forbes’ World’s Top Performing Banks 2026

September 18, 2026

Subscribe to News

Get the latest UAE news and updates directly to your inbox.

Latest Posts

Microsoft and CPX Expand ‘She Protects’ with Second Cohort at GISEC Global 2026

September 18, 2026

Visa and LALIGA Announce Official Partnership in MENA

September 18, 2026

Transguard Group and Malabar Gold & Diamonds Announce Strategic Partnership

September 18, 2026
Facebook X (Twitter) Pinterest TikTok Instagram
© 2026 Daily Guardian UAE. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.